Installation Instructions

Table Of Contents
© ip.access Ltd
COMPANY CONFIDENTIAL CENG0336_XE_nanoBTS_Installation_and_Test_Manual.doc
- 39 -
Figure 23 - Ethernet Connections
Ensure that the connection to the main LAN (Server) is only made to the
UPLINK (i.e. 48Vdc operation).
Connect each nanoBTS to the powered output of the power inserted as shown in
Figure 23, ensuring that the connection is made only to an ip.access nanoBTS.
Uplink
connection
Downlink
connections