1.8 Mounting the nanoBTS
The location of each nanoBTS is shown on the installation floor plan produced at the
network planning stage. The network wiring must be complete before the nanoBTS
can be installed and commissioned. The nanoBTS should be placed on a wall at or
above head height or on a ceiling.
Remove the nanoBTS from the bracket by sliding the removal tool over the central fin
between the bracket and the body of the unit to disengage the locking spring, slide
bracket to separate it from the main body of the unit. The tool may be inserted from
the top or bottom of the nanoBTS
Figure 11 - nanoBTS Bracket Removal
Position the bracket on the wall and mark the position of the four screw holes. The top
of the bracket MUST be positioned uppermost. Ensure that the bracket is level and
sufficient clearance is maintained to allow the unit to be located on the bracket (at
least 80mm from the bracket to the top of wall and 120mm from the side of the
bracket to a side wall). See the diagram below, Figure 12 - Fixing the wall bracket.
80mm min
120mm min
Figure 12 - Fixing the wall bracket
Drill the four holes in the positions marked previously and insert wall plugs (if
required) and fix the mounting bracket securely to the wall. The bracket is designed to
allow the nanoBTS unit to be mounted with the connections at the bottom of the unit.
Slide the nanoBTS onto the bracket and ensure that the retaining spring engages into
the indent at the rear of the unit.