User's Manual

nanoLTE AP Hardware Installation nanoLTE E40 AP Hardware Installation
NANO_INST_43311 v101_0.2 for N4G_1.1 © ip.access Limited 2016 Page 12
3) Mark the position of the four screw holes.
4) Drill the four holes in the positions marked previously and insert wall plugs (if
required) and fix the mounting bracket securely to the wall.
5) Slide the E40 AP onto the bracket and ensure that the retaining spring engages
into the indent at the rear of the unit.
6) Remove the cover to reveal the cable ports and LEDs.
7) Plug in the required cables. Plug an Ethernet cable from a switch/gateway into
LAN and an optional power supply into the +12V DC input:
Route the cables through the opening in the back cover.
8) To refit the lower cover, slide it onto the main cover until the tabs snap into place.