nanoLTE AP Hardware Installation Installation Overview and Requirements
NANO_INST_43311 v101_0.2 for N4G_1.1 © ip.access Limited 2016 Page 5
2.3 nanoLTE E40 AP Site Requirements
In addition to the site requirements for all APs, each E40 AP will require:
A site for wall mounting
Power supplied via the supplied mains adaptor unit, supplied separately, which
requires a suitable mains power supply point near the AP that is within reach of the
adaptor’s cabling.
2.3.1 nanoLTE E40 AP Power Requirements
Maximum expected power consumption:
20 Watts (Rated +12V on the DC input)
The E40 AP uses Direct power from a suitable DC source (+12V, 2.5A rated centre positive
2.1mm jack) - a suitable mains adaptor is supplied.
PSU
The E40 does not use POE. The following 12V PSU is supplied:
There must be a suitable mains power supply point for plugging in the power adapter. The
lead on the PSU is approximately 1.5m long, hence the power supply point must be within
1.5m of the AP.