User's Manual
Table Of Contents
- nano3G AP Installation Manual
- Table of Contents
- 1 Introduction
- 2 Installation Overview and Requirements
- 3 Pre-Provisioning a nano3G AP
- 4 Configuration File Preparation
- 5 Commission a nano3G AP
- 6 nano3G AP Hardware Installation
- 7 Finalize Installation
- 8 Troubleshooting
- 9 nano3G AP and PSU Regulatory Information
nano3G AP Installation Manual nano3G AP Hardware Installation
N3G_INST_300 v14.0 for N3G_2.85 © ip.access Limited 2012 Page 57
6.3.2 Removable Cable and Antenna Covers
The nano3G E8 AP and E16 AP have two removable covers. The top cover goes over the
antennae, and the bottom cover goes over the cable sockets.
1) Place the unit on a flat surface.
2) Press the sides of the unit next to the cover to be removed. Do not apply excessive
force.
3) Slide the cover off.
4) To refit the cover, simply slide it back onto the tabs on the main cover until it snaps
into place.
6.3.3 Antennas