Installation Guide

Table Of Contents
nano3GAP Installation Manual Installation Requirements
© ip.access Ltd Page 3
2 Installation Requirements
2.1 nano3GAP Site Requirements
2.1.1 nano3GAP-4 Site Requirements
The nano3GAPs are installed in retail or small office environments. In summary, each AP
will require:
One of:
o A suitable mains power supply point within [1.5] metres of the intended AP
site.
o Power over Ethernet (where mains power is remote).
An Ethernet connection that provides an IP address (via static addressing or via
DHCP) and a route to the public Internet. A DNS service is also required to
resolve symbolic addresses.
Site for wall mounting or a stable free-standing position.
Cat5 cable.
2.1.1.1 Power
Maximum expected power consumption: 13 Watts (Rated 9VDC 1450mA)
The nano3GAP-4 supports the following power and Ethernet cabling options at a site:
Direct power from a power adapter
Power-over-Ethernet
o from a POE switch
o from a POE inserter