User's Manual
Table Of Contents
- nano3G AP Installation Manual
- Table of Contents
- 1 Introduction
- 2 Installation Requirements
- 3 nano3G AP Hardware Installation
- 4 Commission a nano3G AP
- 5 Configuration File Preparation
- 6 Configuring a nano3G AP from the OMC-R
- 7 Troubleshooting
- 8 nano3G AP and PSU Regulatory Information
nano3G AP Installation Manual nano3G AP Hardware Installation
N3G_INST_300 v6.3 for N3G_2.0 © ip.access Limited 2010 Page 15
Note: No screws are supplied to mount the AP or the splitter unit.
2) Check that the serial number on the nano3G S4 AP unit matches the label on the
box.
3) Check that the items have not been damaged in transit.
For any damaged units, contact the supplier immediately for returns advice.
3.2.2 Commission the nano3G S4 AP
Configure the AP so that it will connect to its serving AC. If this has not been done already,
do this now, before installing the AP in its final location. For instructions, see section 4.
3.2.3 Cable Connections
Use one of the cable connection schemes described below, to provide power and the LAN
connection.
Supplied PSU and LAN
When the supplied PSU is used to power the AP, the POE injector and splitter units are not
needed. However, this means that the mains socket providing power to the AP must be
within reach of the cabling included with the supplied PSU (less than 2m).
POE Injector and Splitter
This improves flexibility for locating the AP, as the AP can be up to approximately 100m
from a mains power supply, depending on the placement of the POE Injector.
In this case, the PSU for the AP is not used. The injector takes a direct mains input using
the supplied mains cable.