Users Manual Part 6

IBA | 45-2 |
Clinical User’s Guide
Volume 1 - Treatment Session
|Part X
- Preparing for Treatment Preparing a Treatment Room
|
GTR Preparation
Procedure
1. Move the gantry to a position suitable for loading the patient onto the coach.
2. Secure the patient onto the couch.
Important Always check the Treatment Room’s temperature and pressure in the
morning Quality Assurance (QA) and enter the data in the Dosimetry
Manager. Monitor the temperature and pressure during the day.
Whenever the values deviate from the last values known to the system,
these new values must be updated in the system via the Dosimetry
Manager.
Do instruct the Accelerator Operator to enter and save the ICEUs
average pressure and IC2/IC3 temperature on the
NOZZLE MORNING CHECKS
S
CREEN.
WARNING Whenever the temperature and pressure deviate beyond the treatment
center quality management plan threshold, the temperature and
pressure have to be updated manually using the Dosimetry Manager.
WARNING If a patient is not safely secured to the PPS, the patient may fall off. Each
patient shall be safely secured before moving the PPS.
WARNING Patients shall be properly secured and their limbs (that is, arms, hands,
feet, and legs) shall not hang over the edges of the couch or be able to
reach the accessory drawer. In addition, it should be impossible for the
patient to access a hazardous moving part under the couch.