Users Manual Part 5

Clinical User’s Guide
IBA | 36-9|
Volume 1 - Treatment Session
|Part VI
- Using adaPT
deliver
in Standalone Mode Monitoring and Controlling the Treatment
|
You can access the B
EAM LINE CHECKS TAB also by clicking the beam line icon ( )
from the Equipment panel of the T
REATMENT SCREEN.
Figure 36-8. Beam Line Checks Tab
(Typical)
CAUTION In case the Beam Line Checks tab shows the SGCU, RFCU, Primary or
Secondary dose IC relay check is failed, request (from the maintenance
team) a verification of the structural integrity and the proper
functioning of the BDCU related equipment (i.e. RTCBs and/or nozzle
EMIOs electrical wiring).
If the maintenance operation cannot be performed immediately as
recommended, it is possible to postpone the maintenance operation
and to proceed with the treatment by entering a specific password (click
on the failed check for instructions). In this case, treatment will be
delivered with loss of redundancy for beam interruption in case of
failure.
In any case, verification must be performed within 24 hours.