User's Guide

LSP3A Clear User’s Guide
It is only for internal use and shall not be spread without permission
23
Figure 5.4: LSP3A Clear PEM Connectors & Cables Location
Steps to undergo:
1. Prepare a 2 wire cable of appropriate length and number of connectors to wire up each
pedestal. Use the 3.81 mm Push-On Green Plugs Vertical Cable Entry provided.
2. Connect all pedestals Synchronization to the Synchronization I/O as shown on Figure 5.4.
3. Set each pedestal to hardwire synchronization modifying the “Mode” in the “Synch” Section
of the “Advanced Configuration” tab of the LSP3A Pedestal Configuration Tool.
4. Write down the MAC address of each pedestal. Use the test button in “Monitoring” tab to
locate it: the connected pedestal will ring and its display lit.
5. Power up the whole system (every pedestal must be powered up) and check that the
synchronization process works properly detecting a book in each passageway.
6. Put the cover panel back into place and secure it with the 4 screws
5.3 Parameters Configuration of the Ethernet Interface
Don’t forget to power up your installation before carrying on the
following steps
The first step is to allocate a unique IP address to each LSP3A. This operation will allow
identifying each LSP3A on site before configuring them on the Ethernet network.