User's Guide

LSP3A Clear User’s Guide
It is only for internal use and shall not be spread without permission
22
Figure 5.2: 3 Pedestals Configuration Example and Token Propagation
Wire Synchronization Token hand over
Wire connection:
First prepare a cable of appropriate length to connect 2 consecutive Electronics as shown in
Figure 5.3 and Figure 5.4
A minimum wire gauge of 22AWG (0.2mm²) is enough, preferably a twisted pair. Screw at
each extremity of the cable a 2-way connector with ground wire at the same position for each
module. If more than 2 pedestals are used to form the aisle, then connect the wires in parallel to
go to the next pedestal until you reach the last one.
Figure 5.3: Detailed Wire Synchronization Assembly
Then unscrew the 4 screws to open the bottom plastic cover panel of each pedestal forming
the aisle to gain access to the Product Electronic Module and connect the top 2-way connector as
shown in Figure 5.4 thereafter.