User's Guide

LSP3A Clear User’s Guide
It is only for internal use and shall not be spread without permission
18
When tightening the screws in place, first tighten the screws in place ¾ of
the way. Once all screws are in place, then tighten each screw progressively,
one after each other to ensure that the floor bracket is solidly fixed into place
and completely vertically aligned. The use of a level may be required.
7. Plug in the mains IEC power cord from the previous pedestal if daisy chained or from the wall
mounted socket. See figure in Chapter Electrical Safety Rules
No Live AC mains 110/230V during installation!
Make sure there is no power supply current before carrying on the
connectionoperations.
To do so, unplug the IEC Power Cord from the wall socket.
8. Once all the LSP3A pedestal have been installed, close the micro circuit-breaker (Figure 4.1) to
power up the system before starting configuration operations. Please see section 5
Configuration”.
9. After the configuration has been carried on, replace the two plastic covers and tighten the 4
fixing screws.
4.4 LSP3A Clear Replacement or Extension of an existing
Installatio
As all LSP3A Clear have the same mounting plate and people counters location, you can
reuse the existing holes drilled into the floor to affix the replacement pedestal and the IEC power
cord.
Just make sure that you have the right Radio firmware installed in your new pedestal before
starting the system as the aisle synchronization and configuration could be impaired though no
irreversible damages would occur.