Installation Instructions
WiBAS / WiBAS G5 Base Stations
Installation & Cabling Manual - Edition 3.2
247
POE-HP-OD-AC, Continued
Prerequisites
Prepare and terminate the ETH SF/UTP and grounding cables as described
in Appendix B – Terminating Cables.
Prepare and terminate the power supply cable as described in packing box
installation instruction leaflet.
Tools and
materials
Tools
Adjustable torque wrench tool with bits, Adjustable torque U-
wrench tool (see to Equipment installation tools) and drill
machine (refer to Specific works).
Materials
INSTPONE-PL3 for wall installation.
POE-HP-OD-AC
DC-PWR-CAB-1 or DC-PWR-CAB-3
Procedure
For pole / wall and cabling installation of POE-HP-OD-AC refer to packing
box installation instruction leaflet.










