Installation Instructions

Appendix A - Installing Power Injectors
244
POE-HP-OD67-DC, Continued
Prerequisites
Prepare and terminate the ETH SF/UTP, grounding and power supply
cables as described in Appendix B Terminating Cables.
Tools and
materials
Tools
Adjustable torque wrench tool with bits, Adjustable torque U-
wrench tool (see to Equipment installation tools) and drill
machine (refer to Specific works).
TOOL-M20.
Materials
INSTPONE-PL2.
PONE-OD67-AC.
DC-PWR-CAB-1 or DC-PWR-CAB-3
Procedure
For pole / wall and cabling installation of POE-HP-OD67-DC refer to PONE-
OD67-AC Procedure on page 227.