Installation Instructions

Appendix A - Installing Power Injectors
222
POE-AC112-ID / POE-AC75-ID / POE-ID-AC72 / POE-AC60-ID /
POE-AC56-IDH, Continued
Prerequisites
Prepare and terminate the ETH SF/UTP and grounding (only for POE-ID-
AC72) cables as described in Appendix B Terminating Cables.
Tools and
materials
Tools
For wall installation screwdrivers (see Equipment installation
tools) and drill machine (refer to Specific works).
Materials
POE-AC112-ID
POE-AC75-ID ( or POE-AC60-ID)
POE-ID-AC72.
POE-AC56-IDH.
Continued on next page