Installation Instructions
WiBAS / WiBAS G5 Base Stations
Installation & Cabling Manual - Edition 3.2
217
POE-AC112-ID / POE-AC75-ID / POE-ID-AC72 / POE-AC60-ID /
POE-AC56-IDH, Continued
Power
injectors
overview
POE-AC112-ID
#
Marking
Details
Use
A
-
3-pins AC socket (EU).
To connect the AC power supply
cord.
B
OUTPUT
INPUT
Gigabit Ethernet 1000
Base-T, Electrical (RJ-
45).
OUTPUT: To connect the Gigabit
Ethernet (S-FTP) cable for carrying:
traffic
inband management
superimposed DC power towards
to radio unit.
INPUT: To connect the Gigabit
Ethernet (S-FTP) cable for carrying:
traffic
inband management towards to
customer network.
C
PWR
Power LED.
To provide power status.
D
-
-
To install onto the wall.
Continued on next page










