Installation Instructions
4. Installation Procedures
208
Cable Holder
Introduction
Apply this procedure for installing the cable holder to the following WiBAS
TM
Base stations:
WiBAS
TM
OSDR-HUB (OSDR-HOLD-2 and OSDR-HOLD-5)
WiBAS
TM
G5 dual-BS (CBL-HLDR-GX).
Tools and
materials
Tools
Adjustable torque wrench tool with hexagon male bit (refer to
Equipment installation tools).
Materials
OSDR-HOLD-2 or OSDR-HOLD-5
CBL-HLDR-GX
Radio units.
Continued on next page










