Installation Instructions

WiBAS / WiBAS G5 Base Stations
Installation & Cabling Manual - Edition 3.2
205
Fiber Optic Cable, Continued
Procedure for
WiBAS G5
dual-BS,
continued
Step
Action
10
For unpluging fiber optic cable with diameter 4.5 mm up to 7.5
mm, perform the actions as shown below.
The cable latter is locked into the SFP module and must
be extracted first before unplugging the cable.
Remove the M20 gland (all parts).
Press the cable latter (A) with the flat side of extruder to
release the cable and then pull it outwards (B).
SFP module comprising by a bail-delatch mechanism. Mount
the hook part of the extruder (C) into the bail and pull
backwards for removing the module, as shown below:
End of procedure.