Installation Instructions
WiBAS / WiBAS G5 Base Stations
Installation & Cabling Manual - Edition 3.2
199
Fiber Optic Cable, Continued
Procedure for
WiBAS G5
micro-BS /
evo-BS,
continued
Step
Action
4
Perform the following:
Remove the optical cable protection caps (A).
Pass the cable through the parts of gland, as shown below
(B).
Connect the cable to SFP module.
Assemble the connector by tightening all parts together.
Use the adjustable U-wrench to tighten.
Do not over tighten. Adjust the tool for applying
maximum tightening torque, as follows:
Item
Max. Tightening Torque
M20 Thread Extension
5.5 Nm
Body
4.5 Nm
Sealing Nut
5 Nm
Continued on next page










