Installation Instructions

WiBAS / WiBAS G5 Base Stations
Installation & Cabling Manual - Edition 3.2
179
Grounding Cable, Continued
Procedure for
WiBAS G5
dual-BS
How to install the grounding cable to WiBAS
TM
G5 dual-BS radio unit,
proceed as follows:
Step
Action
1
Use the tool to remove the M5 nut and one spring washer.
Then install the cable, as shown below:
Use the tool to tighten the M5 nut.
Do not over tighten. Adjust the tool for max tightening
torque 4.2 Nm.
2
After radio unit installation onto pole do not forget to
install the other end of the cable to grounding bar.
End of procedure.