Installation Instructions
WiBAS / WiBAS G5 Terminal Stations
Installation & Cabling Manual - Edition 2.1
201
POE-HP-OD67-DC, Continued
Precautions
Ensure that: the Safety Precautions on page 17 are applied.
Prerequisites
Prepare and terminate the following cables:
ETH cable as described in Ethernet (S-FTP).
Grounding cable as described in Grounding.
Power supply cable as described in Power.
Tools and
materials
Tools
Adjustable torque wrench tool with bits, Adjustable torque U-
wrench tool (see to Equipment installation tools) and drill
machine (refer to Specific works).
TOOL-M20.
Materials
INSTPONE-PL2.
PONE-OD67-AC.
DC-PWR-CAB-1 or DC-PWR-CAB-3
Procedure
For pole / wall and cabling installation of POE-HP-OD67-DC refer to PONE-
OD67-AC Procedure on page 184.