Installation Instructions

Appendix A - Installing Power Injectors
194
PONE-OD-DC, Continued
Procedure,
continued
Step
Action
2
Perform the following actions for installing the Ethernet (S-
FTP) cables:
Use the tool with TORX T10 bit to remove (A) the clamp
screw. Be careful not to drop the screw while removing.
Plug (B) the Ethernet cables to the Gbe receptacles (OUT:
goes to radio unit and IN: goes to customer network). Listen
for a “click” when inserting. This verifies that the jack has
been inserted properly.
The shielded wires should protrude from clamp about 0.5
cm (as shown below).
Use the tool with TORX T10 bit to install the clamp (C) for
securing the cables in place.
Do not over tighten. Adjust the tool for max tightening
torque 0.9 Nm.
Continued on next page