Installation Instructions
WiBAS / WiBAS G5 Terminal Stations
Installation & Cabling Manual - Edition 2.1
179
POE-AC75-ID / POE-ID-AC72 / POE-AC56-IDH / POE-ID-AC35,
Continued
Precautions
Ensure that: the Safety Precautions on page 17 are applied.
Prerequisites
Prepare and terminate the ETH cable as described in Appendix B –
Terminating Cables.
Prepare and terminate the grounding cable as described in Appendix B –
Terminating Cables (only for POE-ID-AC72).
Tools and
materials
Tools
For wall installation screwdrivers (see Equipment installation
tools) and drill machine (refer to Specific works).
Materials
POE-AC75-ID ( or POE-ID-AC35)
POE-ID-AC72.
POE-AC56-IDH.
Continued on next page