2. Before Starting the Commissioning
14
Prerequisites
Required
commissioning
data
Commissioning data at site should be entered according to Radio and
Network planning.
The following commissioning data should be available before starting
commissioning works on site:
RF planning values: expected RSSI, SNR, Modulation and Tx Power.
Modem and Radio configuration data: Bandwidth, Tx Frequency and ACM
& ATPC Profiles.
Management settings: IP Address, Subnet Mask, Gateway Address and
Management VLAN.
On-site works
Before starting any commissioning actions, ensure that all the following
works have been carried out on site according the below table:
Check about Reference Manuals
Description Chapter No. Paragraph
Radio unit grounding.
OSDR
Installation
Manual
4 4.2
WiBAS-
Connect
Installation
Manual
4 4.4
Radio unit cabling.
OSDR
Installation
Manual
3 3.2
WiBAS-
Connect
Installation
Manual
3
Radio unit
cabling.
Power injector installation
OSDR
Installation
Manual
Appendix C All
WiBAS-
Connect
Installation
Manual
Appendix D All
Continued on next page