User Manual
Table Of Contents
StreetNode 6250 PTP with Embedded Node Manager
WebUI Commissioning Manual – Edition 1.1
10
Startup & Commissioning Procedure, Continued
Overview, continued
Step
Action
Details Refer to
4
Visit site
B.
a.
Repeat steps 1 to 3 for site B. -
b.
Perform antenna alignment at
site B.
§ Configuring Antenna
Alignment.
c.
Save node B configuration.
§ Saving
Configuration.
5
Connect
to site A
(from
site B) to
carry out
alignment
.
a.
Use your web browser and the
IP address of StreetNode node
at site A.
§ Log in (Chapter 2).
b.
Perform antenna alignment at
site A.
§ Configuring Antenna
Alignment.
c.
Save node A configuration.
§ Saving
Configuration.
6
Link
verificatio
n &
completio
n of
tasks.
a.
At site B, ensure that:
Link Status (local/remote) = Locked
Radio Communication Status =
Connected
§ Summary
Information (Section
8.1).
b.
Verify that no active alarms exist
for radio, modem & traffic ports.
Chapter 7 (Status).
c.
Dispatch the IP addresses of all
nodes to the NMS team.
The NMS team will then be able
to take control and proceed to
Ethernet QoS configuration and
Ethernet provisioning.
Section 5.3 (Ethernet
QoS Configuration).
§ Adding VLANs /
VLAN Ports.
End of commissioning procedure.