Installation Manual

Table Of Contents
StreetNodeā„¢ 6250 PTP
Installation & Cabling Manual - Edition 2.1
73
Appendix A: Terminating S-FTP Cable, Continued
Termination
procedure
(continued)
Step
Action
7 With the pliers, bring the terminal of the connector back, over the
exposed shield, and press gently around the terminal to form. This
will achieve good contact with the shield.
For termination type A:
For termination type B:
Continued on next page