Installation Manual

Table Of Contents
StreetNode™ 6250 PTP
Installation & Cabling Manual - Edition 2.1
71
Appendix A: Terminating S-FTP Cable, Continued
Termination
procedure,
continued
Step
Action
5
a.
Fold back the crimping terminal of the connector.
b. Fully insert wire guide and cable into the connector’s body
until the shield (overlapping the jacket’s end) reaches the
crimping position.
For termination type A:
For termination type B:
Continued on next page