Installation Manual

Table Of Contents
Chapter 3. Installation of StreetNode 6250 PTP
66
Installation of Power Injector (Power over Ethernet), Continued
Cabling
installation
(PoE)
To install Ethernet and power cables , proceed as follows:
Step
Action
1 Prepare and terminate the Ethernet cables (x 2) as instructed in
Appendix A: Terminating Ethernet (S-FTP) Cable on page 67
.
2 Connect the receptacle OUT of the PoE to the GbE2 receptacle
of the StreetNode
TM
6250 PTP.
Connect the receptacle IN of the PoE to the network switch.
3 Install the IEC plug to the respective input of the PoE an the
other plug to the available main socket.
End of the procedure.