Installation Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
Chapter 3. Installation of StreetNode 6250 PTP
60
Installation of Power Injector (Power over Ethernet)
Introduction
StreetNode
TM
6250 PTP can be powered by either direct powering or Power
injector.
The power injector can be either
PonE (DC -indoor or outdoor) or PoE (AC – outdoor only).
PonE:
• The power at the input of PonE box must be measured in the range of
–40 V dc to –60 V dc.
• PonE must be connected to the DC distribution board and more specifically
to a magnetic circuit breaker (single-pole MCB 6 A, 80 V dc, B-curve for
Telecom Applications).
• Safety requirements require a single pole circuit-breaker to be
employed between the Local DC Power Source and PonE box. The
circuit-breaker must disconnect the negative (-) V pole of the power
supply.
• The positive pole of the Local DC Power source must be grounded.
Before plugging or unplugging any cable into PonE device as well as
into StreetNode
TM
6250 PTP, you must switch-off the Local DC
Power Source and set the circuit breaker to OFF!
No
Description
1
Power Cable.
2
Single pole Circuit.
3
Local DC Power
Distributor.
PoE:
PoE is an indoor device only and can be installed as desktop or in a wall
surface, as shown below:
Materials for wall mount installation are not included on the packing list of
the product ((requires wood plugs (5 mm X 25 mm) and wood screws cross-
headed (4 mm x 30 mm)).
Continued on next page