Installation Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
StreetNode™ 6250 PTP
Installation & Cabling Manual - Edition 2.1
41
3. Installation of StreetNode 6250 PTP
Mechanical Installation & Grounding
Precautions
Before start any installation action please follow the
instructions for Antenna Hydrophobic Coating Protection
on page 37.
Never leave unoccupied receptacles without cover.
Covering receptacles is necessary to protect against
humidity penetration.
Topics
This paragraph describes the following procedures of StreetNode
TM
6250
PTP:
• Lamp post (or pole) installation
• Building wall surface installation
•
Grounding cable installation
Tools and
materials
#
Lamp Post
(or pole)
Installation
Building Wall
Surface Installation
Grounding Cable
Installation
Materials
Items A & F from
Packing list
materials on page
5.
Items A & E from
Packing list materials
on page 5.
• Item A from
Packing list materials
on page 5.
• Item A from
Grounding materials
on page 9.
Tools
Item 1 from
Equipment
installation tools on
page 38.
Items 1 (with 3 mm
and 8 mm), 2 (R.8)
and 5 from
Equipment
installation tools on
page 38.
• Item 1 (with 8 mm)
from Equipment
installation tools on
page 38.
• Items 14 and 15
from Grounding
cable termination
tools on page 40.
Continued on next page