Installation Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
Chapter 2. Prior to Installation
36
Cable Length Restrictions, Continued
Cable length
restrictions,
continued
• S-FTP cable (CAT5E or CAT6) used with provided power injectors
(1)
,
continued
S-FTP cable (CAT5E or CAT6) used with provided DC type power injectors
(with order code PONE-OD-DC):
The length of the SFTP cable, between PonE injector and radio unit, cannot
reach 100 meters when the DC voltage at the input of the PonE is the lowest
defined by the standards (40.5 V).
This is because the voltage drop on the S-FTP cable will result in the
Voltage at the input of the DC power module of the radio unit to be less than
the min allowable value for operation. Higher input voltage need to be
applied to ensure proper powering of the radio.
The following table shows the maximum SFTP cable length versus the
voltage at the input of the PONE for Cat5E and Cat6 cable types.
Input voltage to the PonE
(VDC)
max length of Cat6
S-FTP cable (m)
max length of Cat5E S-
FTP cable (m)
40
80.00
65
40.25
85.00
70.00
40.5
90.00
75.00
40.75
95.00
80.00
41
100.00
85.00
41.25
100.00
90.00
41.5
100.00
95.00
41.75
100.00
100.00
42-60
100.00
100.00
(1)
Use of PoE/PonE powering is applicable only with radio units featuring DC power module.