Installation Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
Chapter 2. Prior to Installation
6
List of Materials, Continued
Powering
materials
The powering materials consist of the following categories:
• Power injectors
• Power cables
• Power modules & connectors
Power injectors
The following table shows the power injectors:
Item Order Code / Photo Description
A
POE-ID-AC75
PoE injector, indoor, -20°C to +40°C, 90
VAC to 264 VAC, 47 Hz to 63 Hz, 75 W.
(AC power cord - EU plug
(1)
is included)
B
POE-IDH-AC56
PoE injector, indoor, temperature hardened,
-40°C to +60°C, 90 VAC to 264 VAC, 47 Hz
to 63 Hz, 56 W.
(AC power cord - EU plug
is included)
C
PONE-OD-DC
PonE injector, outdoor, wall mount
(2)
, -50°C
to +65°C,
48 VDC, 60 W (4 x screws and upats, are
included & an M3 grounding screw is pre-
installed on the unit).
D
PONE-OD67-AC
PonE injector, outdoor, wall mount,
temperature hardened, -40°C to +55°C
(operation), 90 VAC to 264 VAC, 47 Hz to 63
Hz, 70 W, IEC 60529 / IP67 class.
Ethernet cable glands and power connector
are included in the unit package. AC power
cable should be ordered separately.
• For wall installation,4 x screws and wall
plugs are included in the unit package.
• For pole installation, a bracket and
accessories (INSTPONE-PL2) should be
ordered.
For grounding requires GND-KIT16-OD (see
page 9)
For powering requires AC-PWR-CAB (see
page 7)
Continued on next page
(1)
Other plug types can be made available upon customer request
(2)
For pole installation, a bracket and accessories (INST-PONE-PL) should be ordered