Installation Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
StreetNode™ 6250 PTP
Installation & Cabling Manual - Edition 2.1
3
1. Introduction
About this Document
Scope of
document
This document is the Installation & Cabling Manual of StreetNode
TM
6250
PTP : Point-to-Point all-outdoor Gigabit Radio 60 GHz.
Target
Audience
This document is addressed to certified technicians with wireless equipment
knowledge and skills concerning the following:
• Outdoor Radio Unit Installation (Lamp Post or Building Wall).
• Preparation & Termination of: Ethernet, Power & Grounding cables.
• Laying and Installing of: Ethernet, Power, Grounding & Fiber Optic Cables.
• Testing Ethernet cables using Ethernet testers.
Reference
manuals
Other necessary information about product features and set-up can be found
in the related product documents :
Item
Product Documents Description
1
StreetNode
TM
6250 PTP System Description
2
StreetNode
TM
6250 PTP Start Up & Commissioning Manual
3
StreetNode
TM
6250 PTP Node Manager - Reference Manual
4
StreetNode
TM
6250 Release Notes
Conventions
This document applies the following conventions:
• Bold font is used when describing something very important.
• Blue bold font is used for order codes.
• Blue underline font is used when describing references.
This symbol means DANGER. The purpose of this symbol is to
warn you that any wrong action can cause bodily injury or even
death.
This symbol means CAUTION. The purpose of this symbol is to
prevent you from performing an action that might result in damage
or serious malfunction of the equipment.
A note denotes attention to important supplementary information.
A hint denotes helpful piece of advice or practical suggestion.