User's Manual
Table Of Contents
StreetNode 6250 PTP with Embedded Node Manager
WebUI Commissioning Manual – Edition 1.1
8
Startup & Commissioning Procedure
Introduction
On the following pages, an overview of the startup and
commissioning procedure is provided.
For detailed instructions on the included steps, the reader is
prompted to the respective section of the Reference Manual of the
Node Manager for StreetNode
TM
6250 PTP.
Precautions
You must configure the modem operation of all
StreetNode
TM
6250 PTP nodes (participating in the
link) so that:
•
Both nodes are configured to have the same
channel bandwidth / size and adaptive mode.
•
If MAC header suppression is enabled for
one node, the same must be done for the
other node(s) of the link.
Continued on next page