User's Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
StreetNode™ 6250 PTP
Installation & Cabling Manual - Edition 2.1
27
Site Prerequisites, Continued
Grounding
Ensure the following:
• To make a protective earth connection, use the grounding point located on
the radio unit using an, as short as possible, length of grounding cable of at
least 6mm
2
diameter (recommended 16mm
2
) or according to local electrical
code.
•
A grounding bar is required close to each equipment installation position.
Outdoor
grounding
system
An appropriate, low-resistance grounding system as specified by the local
regulations is required.
A grounding point (designated GND) should be located close to the
mounting position of the equipment.
The equipment will be connected to this grounding point, via the supplied
grounding cable.
This can also provide partial protection against Lightning-induced current.
For additional protection against lightning LSPs need to be used.
For more information regarding the installation of LSP/PSP please refer to
the following manual:
Lightning & Surge Protection for Intracom Telecom Radios – Installation
Practices
Continued on next page