User's Manual
Table Of Contents
- Revisions
- Reasons of change
- Introduction
- Regulations
- General installation guidelines
- (RF exposure)
- Compliance boundary definition
- Table of Contents
- 1. Introduction
- Scope of document
- Target Audience
- Reference manuals
- Conventions
- 2. Prior to Installation
- Topics
- Packing list materials
- Powering materials
- Power injectors
- Power cables
- Power modules & connectors
- Grounding materials
- Data traffic materials
- S-FTP cables
- Fiber optic cables
- SFP
- Pole fastening materials
- Mounting bracket
- Steel hose clamps
- Cable ties
- StreetNodeTM 6250 PTP(1)
- Outdoor DC PonE
- Outdoor AC PonE
- Indoor AC PoE
- Anchor point
- / /
- Introduction
- Site survey
- Preparation of the installation premises
- Network port distributors
- Cables routing (lamp post)
- Power cable routing
- Cable conduits
- Wall installation
- Installation location
- Lamp post or pole
- Grounding
- Outdoor grounding system
- Power supply source
- Circuit breakers
- Line Of Sight (LOS) verification
- Lightning & Surge protection
- Internal ovp(2)
- Safety
- Introduction
- Cable length restrictions
- Instruction
- Topics
- Equipment installation tools
- Ethernet cable termination tools
- Power supply cable termination tools
- Grounding cable termination tools
- 3. Installation of StreetNode 6250 PTP
- Mechanical Installation & Grounding
- Installation of Traffic Cable(s)
- Installation of Power Cable (Direct Powering)
- Installation of Power Injector (Power over Ethernet)
- Appendix A: Terminating Ethernet (S-FTP) Cable
- Appendix B: Terminating Power Supply Cable
- Appendix C: Terminating Grounding cable
- Appendix D: Removing StreetNode 6250 PTP
- Appendix E: Standards of Compliance
- Precautions
- Topics
- Tools and materials
- Lamp post (or pole) installation procedure
- Grounding cable installation procedure
- Topics
- Tools and materials
- Ethernet (S-FTP) cable installation procedure
- Ethernet (S-FTP) cable installation with SFP
- Ethernet (S-FTP) cable installation with SFP
- Topics
- Tools and materials
- Procedure
- Introduction
- Topics
- Tools and materials
- Mechanical and cabling installation (PonE)
- Cabling installation (PoE)
- Introduction
- Parts of RG-45 jack
- Termination procedure
- Procedure
- Topics
- Procedure
Chapter 2. Prior to Installation
26
Site Prerequisites, Continued
Wall
installation
All power injectors offered by Intracom Telecom can be installed as desktop
or on a wall surface, as shown below:
• Indoor AC PoE:
Materials for wall mount installation are not included on the packing list of
the product ((requires wood plugs (5 mm X 25 mm) and wood screws
cross-headed (4 mm x 30 mm)).
• Outdoor DC PonE:
Installed as described on Installation of Power Injector (Power over
Ethernet) on page 60. For wall installation, 4 x screws and wall plugs are
included in the unit package.
• Outdoor AC PonE:
For wall installation, 4 x screws and wall plugs are included in the unit
package.
Installation
location
StreetNode
TM
6250 PTP can be installed:
• either on a lamp post or pole, using the mounting plate and the supplied
adjustable hose clamps,
• on a wall surface, using the mounting plate and the supplied wall mounting
accessories.
Lamp post or
pole
• The lamp post or pole must be fastened to a foundation pad of concrete
using anchor bolts.
• The Lamp post or pole should not be swaying during winds more than ± 2
0
.
• For lamp post or pole diameters
(1)
please refer to Steel hose clamps on
page 15.
Continued on next page
(1)
For diameters between 34 mm to 60 mm please contact Intracom S.A Telecom Solutions.