Operation Manual

(187PO) MODEL ZS8110 OZONE & SALTWATER SYSTEM ENGLISH 7.5” X 10.3” PANTONE 295U 05/09/2016
187
PO
SAVE THESE INSTRUCTIONS
English
Page 6
SETUP INSTRUCTIONS
1
. Assembletheabove-ground-pool(AGP)anditsfilterpumpaccordingtotheirinstallation
instructions.
2
. Take the Ozone & Saltwater System and its accessories out of the packaging.
3
. Place the Ozone & Saltwater System in line after the filter pump.
4
. Connect the connector hose
(8)
to the Ozone & Saltwater System inlet.
Connecting the system to pump and pool with 1-1/2” (38mm) connections/hoses,
install as follows:
Drawing #1
IMPORTANT
• TheOzone&SaltwaterSystemrequiresaseparatefilterpump[1500~4000gph
(5680~15140lph)]todrivethewaterandfunctionproperly.
• TheOzone&SaltwaterSystemmustbeinstalledasthelastpieceofpoolequipment
in the water return line to the pool as displayed in Drawing #1. This location extends
the life of the titanium plates.
8
FILTER
PUMP
ID1-1/2”(38mm)
HOSE
ID1-1/2”(38mm)
HOSE
OZONE &
SALTWATER
SYSTEM
SWIMMINGPOOL
WATER TO
POOL
PLUNGER
VALVE
WATER
FROMPOOL
1
. Godirectlytostep2ifyourpoolisempty.Ifyourabove-ground-poolisfilledwithwater,close
the plunger valves before installing the Ozone & Saltwater System.
2
. Disconnect the water return hose from the filter pump connection and connect it to the Ozone
& Saltwater System outlet.
3
. Connect the connector hose
(8)
to the filter pump outlet connection.
4
. Open the plunger valves to allow the water to flow.