Operation Manual

(187PO) MODEL ZS8110 OZONE & SALTWATER SYSTEM ENGLISH 7.5” X 10.3” PANTONE 295U 05/09/2016
187
PO
SAVE THESE INSTRUCTIONS
English
Page 17
MAINTENANCE (continued)
Flow Sensor Cleaning
1
. In a counter-clockwise motion unscrew the collar of the flow sensor
(7)
and remove it from
the electrolytic cell conduit. See “Part Reference”.
2
. If deposits and debris are seen on the surface of the flow sensor, then use a garden hose
to wash it off.
3
. If flushing with water does not remove the deposits, use a plastic brush to clean the surface
and the hinge if necessary. Do not use a metal brush.
4
. After the flow sensor has been inspected and cleaned, align the locator notch on the flow
sensor to the connection ridge in the conduit. Now turn the collar in a clockwise motion,
tightening the sensor back into its position. Do not overtighten.
Electrolytic Cell Cleaning
The electrolytic cell has a self cleaning function incorporated into the electronic control's
programming. In most cases this self cleaning action will keep the cell working at optimum
efficiency.Ifthepoolwaterishard(highmineralcontent)thecellmayrequireperiodicmanual
cleaning. To maintain maximum performance, we recommend that you open and visually
inspect the electrolytic cell monthly.
The following steps provide instructions on how to clean your cell.
Inspection and cleaning:
1
. Switch off the unit, unplug the power cord from the electrical socket.
2
.
For filter pumps with 1-1/2” (38mm) hose size -
Turn both plunger valve handles fully
clockwise until they stop. This closes the valve, prevents the water from flowing out of the
pool.
3
. In a counter-clockwise motion, unscrew the Titanium electrode plug nut. Pull out the
Titanium electrode plug.
Connection Ridge
Locator Notch
Hinge