Operation Manual

119
PO
SAVE THESE INSTRUCTIONS
(119PO) RECTANGULAR ULTRA FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 07/22/2015
English
Page 13
POOL SETUP (continued)
5.
ThetopsoftheU-shapedsidesupportshaveadouble
buttonspringloadedclip
(10)
thatisfactorypre-installed.
Insertthesidesupportsintothe“A-B-C&D-E-F”beam
holesbysqueezingthebottombuttoninwardwithyour
fingers.
Squeezingthisbottombuttonwillallowthesupporttoenter
thebeam.OncetheU-supportisinsidethebeamrelease
thefingerpressureallowingthesupportto“SNAP”into
place.RepeatthisprocedureforallU-shapedsidesupports
(seedrawing5).
6.
Withonepersonstandinginsidethepool,raiseonecorner;
insert the connecting rod
(12)
intotheoverlapping
openings,toconnectthelinerstrapstotherestrainer
straps.Repeattheoperationintheothercornersandthen
onthesides(seedrawings6.1&6.2).
7.
Pullthebottomsofthesidesupportsoutawayfromthe
linertomakethestrapstaut.Repeatforalllocations(see
drawing7).
8.
Ifthegroundisnotconcrete(asphalt,lawnorearth)you
mustplaceapieceofpressure-treatedwood,size
15”x15”x1.2”,undereachlegandflushwiththeground.
TheU-shapedsidesupportsmustbeplacedinthecenter
ofthepressure-treatedwoodandwiththewoodgrain
perpendiculartothesupportleg(seedrawing8).
5
13
11
10
6.1
6.2
LINER
LINER
12
7
12
8
Level