User Manual
254
PO
S AVE THESE INSTRUCTIONS
(254PO) SPA ENGLISH 7.5” X 10.3” PANTONE 295U 05/29/2015
English
Page 9
SET UP
(continued)
5.
Press the button to turn on the control unit panel buttons rst. Press the button to inate the
spa tub wall until it is rm to the touch but not hard
(see drawing 6)
.
IMPORTANT:
Do not over inate or use high pressure air compressor to inate.
6.
Press the button again to turn it off.
7.
Disconnect the ination hose
(7)
from the air valve and attach the pressure gauge
(23)
to the air valve.
The pressure gauge indicator should be in the green area for a properly inated spa tub
(see
drawing 7)
. Repeat previous steps to add more air if necessary.
8.
Replace the air valve cap back.
NOTE:
The cap is designed to be screwed on and off. Never exert force as this could cause the
complete internal ination system of the valve to come loose. See “Spa Tub Air Valve Fastening” for
valve maintenance.
Inate the Spa Cover Air Bladder
1.
Open the ination valve and insert the ination
hose
(7)
into the valve; press to inate
until it is rm to the touch but not hard
(see
drawing 8).
2.
Disconnect the ination hose
(7)
from the air
blower ination outlet and the valve.
3.
Replace the control base ination cap
(5)
back;
close and recess the ination valve.
NOTE:
If there is a need to add some air to the spa tub wall or spa cover air bladder after they have been
setup, refer to above “Inate the Spa Tub Wall” and “Inate the Spa Cover Air Bladder” sections. The cover
air bladder is preinstalled inside the spa cover. If it needs to be reinstalled, place the uninated air bladder
inside the spa cover lip before inating the bladder.
Deation
For Spa Tub Wall:
1.
Unscrew the cap to reveal the stem, push the stem
in and turn 90 degree right to secure it in the down
position
(see drawing 9).
2.
Once the deation is completed, push the stem in
and turn 90 degree left to return it to the ination
position.
3.
Replace the cap back.
For Cover Air Bladder:
1.
Pull valve cap out and squeeze the valve at its base
until deated.
2.
Close and recess the valve back.
9
104
F
o
104
F
o
104
F
o
8
7
6 7
23
104
F
o
1
2