Use and Care Manual
315
PO
SAVE THESE INSTRUCTIONS
English
(315PO) Prism Frame™ Premium Pool / Greywood Prism Frame™ Premium Pool ENGLISH 7.5” X 10.3” PANTONE 295U 10/14/2019
Page 14
POOL SETUP (continued)
YoumayhavepurchasedthispoolwiththeIntexKrystalClear™filterpump.Thepumphasitsown
separate set of installation instructions. First assemble your pool unit and then set up the filter pump.
Estimatedassemblytime30-60minutes.(Notetheassemblytimeisonlyapproximateandindividual
assemblyexperiencemayvary.)
1. Liner preparation
• Findaflat,levellocationthatisfreeandclearofstones,branchesorothersharpobjectsthatmay
puncture the pool liner or cause injury.
• Openthecartoncontainingtheliner,joints,legs,etc.,verycarefullyasthiscartoncanbeusedtostore
the pool during the winter months or when not in use.
• Takeoutthegroundcloth
(7)
(optional)andspreaditover
the cleared area. Then take out the liner
(5) and spread it
outoverthegroundcloth,withthedrainvalvedirected
towardsthedrainingarea.Placethedrainvalveawayfrom
the house. Allow the sun to warm up the liner before
inserting the beams
(4)
intothesleeveopenings.
IMPORTANT: Always set up the pool unit with at least
2 persons. Do not drag the liner across the ground as
this can cause liner damage and pool leakage (see
drawing 1).
• Duringthesetupofthispoolliner,pointthehoseconnectionsoropeningsinthedirectionoftheelectric
powersource.Theouteredgeofthepoolshouldbewithinreachofthepump’selectricalconnection.
2. Horizontal beams assembly
• Theframepool’slegs
(2) and beams (4)
fallintotwogroups.Thelargerdiametersarethehorizontal
beamsthatareslid(pushed)intothesleeveopeningsatthetopoftheliner.Thesmallerdiametersare
theverticallegs.BoththeselegsandbeamsfitintotheT-joints
(1).
NOTE: Sprinkle some talcum powder over the horizontal beams before sliding them into the pool
liner sleeve. This will make removal of the beams from the liner easier during the disassembly
of the pool.
• Startingatanylocation,butalwaysworkinginthesamedirection,
pushthehorizontalbeamintothesleeve.Oncethebeamiscentered
take one of the T-joints and attach the joint to one end of the beam.
Push the beam firmly into the T-joint. Repeat this procedure in a
circularfashionuntilallthebeamsandjointshavebeenconnected
(see drawings 2.1 & 2.2).
NOTE:
It’simportanttostartfrom
one location and work in the
same direction until the last attachment.
Donotstartfrommultiple
locations as this will make the connections difficult for the last few
beams and joints.
1
5
4
1
2.1
2.2
4