User guide

1
20
PO
SAVE THESE INSTRUCTIONS
Page 16
(120PO) SEQUOIA SPIRIT
®
WOOD-GRAIN FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 10/06/2011
English
SSEETTUUPP IINNSSTTRRUUCCTTIIOONNSS
POOL ENCLOSURE SETUP
O
nce the pool has been filled with water, and it has been confirmed that it is completely level
and that all vertical legs are positioned in the middle of each patio block, proceed with the
assembly of the pool enclosure.
1
. Top clamp installation
Fasten a top clamp (16) to the T-joint of the pool frame from the underneath. Ensure the
two bolts on top clamp are facing upward. Repeat the procedure until all the top clamps
are fastened to the T joints of the pool frame (see drawings 8.1 & 8.2).
2. Bottom cap and bottom rail installation
Place a bottom cap (25) on the ground and align it with the leg cap. Ensure that the
threaded side hole in the bottom cap is facing outward. Place all bottom caps in position.
Starting at any location, but always working in the same direction, connect a bottom
rail (24) in between two bottom caps (25). Ensure the pre-drilled holes on the bottom rail
hook through the knobs on the bottom cap. Repeat this procedure in a circular fashion
until all the bottom rails and bottom caps have been connected. Adjust the distance of
the bottom cap to the leg cap by estimating that the support post (17) will stand vertical
after it is installed (see drawings 9.1 & 9.2).
8.1 8.2
9.1
9.2