Owner manual

87PO
SAVE THESE INSTRUCTIONS
English
(87PO) ROUND METAL FRAME POOL ENGLISH 7.5” X 10.3” PANTONE 295U 06/13/2013
Page 9
POOL SETUP (continued)
YoumayhavepurchasedthispoolwiththeIntexKrystalClear™filterpump.Thepumphasitsown
separatesetofinstallationinstructions.Firstassembleyourpoolunitandthensetupthefilterpump.
Estimatedassemblytime30-60minutes.(Notetheassemblytimeisonlyapproximateandindividual
assemblyexperiencemayvary.)
1. Liner preparation
• Findaflat,levellocationthatisfreeandclearofstones,branchesorothersharpobjectsthatmay
puncturethepoollinerorcauseinjury.
• Openthecartoncontainingtheliner,joints,legs,etc.,verycarefullyasthiscartoncanbeusedtostore
thepoolduringthewintermonthsorwhennotinuse.
• Takeoutthegroundcloth(10)(optional)andspreaditover
theclearedarea.Thentakeouttheliner(7)andspreadit
outoverthegroundcloth,withthedrainvalvedirected
towardsthedrainingarea.Placethedrainvalveawayfrom
thehouse.Allowthesuntowarmupthelinerbefore
insertingthebeams(6)intothesleeveopenings.
IMPORTANT: Always set up the pool unit with at least 2
persons. Do not drag the liner across the ground as
this can cause liner damage and pool leakage (see
drawing 1).
• Duringthesetupofthispoolliner,pointthehoseconnectionsoropeningsinthedirectionoftheelectric
powersource.Theouteredgeofthepoolshouldbewithinreachofthepump’selectricalconnection.
2. Frame assembly
• Theframepool’slegs(8)andbeams(6)fallintotwogroups.Thelargerdiametersarethehorizontal
beamsthatareslid(pushed)intothesleeveopeningsatthetopoftheliner.Thesmallerdiametersare
theverticallegs.BoththeselegsandbeamsfitintotheT-joints(3).
• Startingatanylocation,butalwaysworkinginthesamedirection,push
thehorizontalbeamintothesleeve.Oncethebeamiscenteredtake
oneoftheT-jointsandusingtheconnectionpin(1),attachthejointto
oneendofthebeambyinsertingthepinthroughtheseal(2) and in the
pre-drilledholes.Repeatthisprocedureinacircularfashionuntilallthe
beamsandjointshavebeenconnected(see drawing 2.1).
The last joint connection may be difficult to complete. You can do
it though, if you first simultaneously raisethe last joint and beam
about 2 inches (5 cm). Now insert the beam into the joint while
lowering the pieces into position. The beam will easily slide into
the joint (see drawing 2.2). Ensure that the last joint is fully
connected before proceeding to connecting the legs.
1
7
1
2
6
3
2.1
2.2
3