Owner manual

NX-1710E Single Door Control
16
LOCATION 8 PROGRAMMING THE DAYS FOR SCHEDULE 1
(1 segment of binary data)
LED1 = "On" if schedule is active on Sunday.
LED2 = "On" if schedule is active on Monday.
LED3 = "On" if schedule is active on Tuesday.
LED4 = "On" if schedule is active on Wednesday.
LED5 = “On” if schedule is active on Thursday.
LED6 = “On” if schedule is active on Friday.
LED7 = “On” if schedule is active on Saturday.
LED8 = “On” if schedule is disabled on holidays.
LOCATIONS 9 - 29 PROGRAMMING THE SCHEDULES 2 - 8
Locations 9 – 29 are used to program the opening times, closing times, and days for Schedules 2 - 8. Each
schedule has three locations that are programmed with the same steps as Schedule 1 described previously.
Refer to Schedule 1 (Locations 6 - 8 above) for specific instructions.
Location 9 – Opening Time for Schedule 2 Location 21 – Opening Time for Schedule 6
Location 10 – Closing Time for Schedule 2 Location 22 – Closing Time for Schedule 6
Location 11 – Days for Schedule 2 Location 23 – Days for Schedule 6
Location 12 – Opening Time for Schedule 3 Location 24 – Opening Time for Schedule 7
Location 13 – Closing Time for Schedule 3 Location 25 – Closing Time for Schedule 7
Location 14 – Days for Schedule 3 Location 26 – Days for Schedule 7
Location 15 – Opening Time for Schedule 4 Location 27 – Opening Time for Schedule 8
Location 16 – Closing Time for Schedule 4 Location 28 – Closing Time for Schedule 8
Location 17 – Days for Schedule 4 Location 29 – Days for Schedule 8
Location 18 – Opening Time for Schedule 5
Location 19 – Closing Time for Schedule 5
Location 20 – Days for Schedule 5
LOCATION 30 PROGRAMMING THE DATE OF HOLIDAYS IN JANUARY
(8 segments of numerical data) Program the day of the month in January that the Opening time in a schedule is
suppressed. For example, if the opening should not occur on January 1, program a “1” in Segment 1. This
feature can be repeated up to a maximum of 8 holidays per location (month). (Default is No holidays)
LOCATIONS 31 - 41 PROGRAMMING THE DATE OF HOLIDAYS FROM FEBRUARY TO
DECEMBER
(8 segments of numerical data) Locations 31 - 41 are used to program the day of each month, from February to
December, in which the Opening time in a schedule is suppressed. Each location will accommodate up to a
maximum of 8 holidays, and programmed with the same steps as Location 30 described previously.
Location 31 – February holidays
Location 32 – March holidays
Location 33 – April holidays
Location 34 – May holidays
Location 35 – June holidays
Location 36 – July holidays
Location 37 – August holidays
Location 38 – September holidays
Location 39 – October holidays
Location 40 – November holidays
Location 41 – December holidays