Installation Manual

QUESTIONS? CALL OUR CUSTOMER SERVICE TEAM AT: 800.737.5386
Rail-IM Rev. 7/16 (RBK-RAIL INSTALL)
2
INTER-FAB BRONZE OR PLASTIC ANCHOR SOCKET INSTALLATION (IN DECK)
NEW CONSTRUCTION INSTALLATION USING IN DECK ANCHOR SOCKETS:
Installing Anchors in the Deck
Determine the correct positioning of each product around the pool. Confirm the maximum/minimum distance from
water’s edge and the correct span between anchors if using two for installation.
• First inspect the anchors for defects or missing pieces.
• For plastic anchors make sure the bonding screw is flush with the inside of the anchor.
Using tool, lower the wedge within the anchor by turning the bolt counterclockwise. To allow maximum clearance
for the product, drop the wedge as far as you can without disengaging the wedge from the bolt.
• Slip the anchor(s) onto the product to confirm fit.
• Tape/Cover the anchor socket and the hole in the bottom of the anchor to keep concrete out.
Check your local electrical code to determine bonding requirements. Bond anchor in accordance to code.
• Make sure the top edge of the anchor is flush with the concrete surface.
• Check that the anchor is level and plumb – critical for proper installation of product.
• Use concrete with a minimum compression strength of 3,000 PSI. Following concrete manufacturer’s
instructions; allow the concrete to fully cure prior to installing product.
Installing Product in Anchor Sockets
• Using tool, lower the wedge within the anchor by turning the bolt counterclockwise. To allow maximum clearance
for the product, drop the wedge as far as you can without disengaging the wedge from the bolt.
• Gently slide product into anchor(s).
• INSTALLATION TIP: To avoid damage to finish and ease of installation use two or more people to install large
span rails and rails with 8” on center spans. Ensure both ends of the rail are lined up plumb with the anchor
and insert both ends at the same time.
• Using tool, tighten wedge anchor by turning the bolt clockwise to secure the product in the anchor. Do not
over tighten.
IN DECK RETROFIT INSTALLATION USING IN DECK ANCHOR SOCKETS:
Installing Anchors in the Deck
You may install Inter-Fab Bronze or Plastic anchor sockets in existing concrete. The integrity of the concrete is
essential to the rigidity/security of the product being installed. Professional installation is recommended.
Determine the correct positioning of each product around the pool. Confirm the maximum/minimum distance
from water’s edge and the correct span between anchors if using two for installation.
• First inspect the anchors for defects or missing pieces.
• For plastic anchors make sure the bonding screw is flush with the inside of the anchor.
• Using tool, lower the wedge anchor by turning the bolt counterclockwise. Drop the wedge as far as you can
without disengaging the wedge from the bolt.
• Slip the anchor(s) onto the rails to confirm fit.
• Mark and drill a minimum 4” diameter hole at least 5” deep.
(See Figure 1)
IN
INSTALLATION TIP: The center of the anchor is not the center line for the product, measure correctly to keep
center line measurements the correct distance apart.
• Do not make holes larger than necessary or escutcheons may not cover the installation.
• Use a pry bar or sledge hammer to break the core pieces from the base of the hole.
• Clean all debris from inside the hole, check the depth and insert the anchor to ensure proper fit.
Check your local electrical code to determine bonding requirements. Bond anchor in accordance to code.
• Cover the hole in the bottom of the anchor with tape to keep concrete out.
• Use concrete or anchoring epoxy, mix to manufacturer’s instructions.
Figure 1