User Guide
Intellisense Systems Inc.
Page 3
TM-AWAR-USG rev 1
User Guide – AWARE Flood System
AWARE Flood Initialization Sequence
Before turning on the AWARE Flood Node, please ensure that
all sensors/modules are connected to the main node. On start-
up, the node will automatically complete the following functions:
1. Establish configuration (initialize camera, sensors,
communications)
2. Calibrate the Water Level Pressure Sensor for water
level measurement (sensor must be plugged in)
3. Inform the user if the battery is fully charged
4. Synchronize the global positioning system (GPS)
Following these functions, the node will go into sleep mode until
the next scheduled sample cycle. A flowchart of the initialization
sequence is provided in Figure 2.
Figure 2: AWARE Flood Initialization Sequence