Owner's Manual

11
Heat & Glo • PRIMO48, PRIMO48ST, PRIMO60, PRIMO60ST, PRIMO72, PRIMO72ST Owner’s Manual • 9/20
E. Before Lighting Appliance
Before operating this replace for the rst time, have a
quali ed service technician:
Verify all shipping materials have been removed from
inside and/or underneath the rebox.
Review proper placement of logs and media, if installed.
Check the wiring.
Check the air shutter adjustment.
Ensure that there are no gas leaks.
Ensure that the rebox glass is sealed and in the proper
position and that the integral glass barrier is in place.
Ensure the appliance is vented with the approved power
vent system: PVI-SLP-B or PVLP-SLP.
Ensure the appliance has one or more compatible
PowerFlow™ Heat Management Systems. See Section
3.H.
Barrier glass is installed properly with “THIS SIDE
OUT” text on outside. See Section 4.C.
• Ensure there is a vertical gap of approximately 3/8
inch between the bottom of the barrier glass and the
transition media tray for adequate air ow. If using the
Passive Heat heat management option, the gap will be
approximately 5/8 inch.
Verify proper damper adjustment setting. See appliance
installation manual.
WARNING! Risk of Fire or Asphyxiation! DO NOT
operate replace with rebox glass assembly removed.