User's Guide
Table Of Contents
- About this Manual
- Manual Organization
- Intel® Serverboard Compatibility
- Additional Information and Software
- Safety Information
- Warnings
- Chassis Description
- Setting Up the Chassis
- Tools and Supplies Needed
- Installation Safety Instructions
- Remove Primary Access Cover
- Remove Bezel Assembly
- Remove Air Ducts
- Remove Hot Swap Fans
- Route Power and Data Cables to the Fixed Drives
- Install 3.5-inch Floppy Drive
- Install DVD or CD-ROM Drive.
- Install Fixed Hard Drive(s)
- Install Hot Swap Drive(s)
- Install Hot Swap Fans
- Install Server Board
- Install Air Dam
- Connect Cables to Server Board
- Install Add-in Board(s)
- Install Air Ducts
- Install an Additional Hot Swap Power Supply Module
- Install Bezel Assembly (Pedestal Only)
- Install Primary Access Cover
- Maintaining Your Server
- Tools and Supplies Needed
- Safety: Before You Remove the Access Cover(s)
- Warnings and Cautions
- Replacing a Fixed Fan (For Base and BRP Chassis Only)
- Replacing a Hot Swap Fan
- Replacing the Front Panel Board
- Replacing a Fixed Power Supply
- Replacing a Hot Swap Power Supply
- Replacing a Power Distribution Board
- Upgrading from a Fixed Power Supply to a Hot Swap Power Supply
- Technical Reference
- Equipment Log and Worksheets
- Regulatory and Compliance Information
- Getting Help
- Warranty

Equipment Log and Worksheets
62 Intel® Server Chassis SC5300 User Guide
Equipment Log and Worksheets
Equipment Log
Use the blank equipment log provided here to record information about your server. You will need
some of this information when you run the SSU.
Item Manufacturer Name and Model Number Serial Number Date Installed
Chassis
Server Board
Processor Speed
and Cache
Memory
Video Display
Keyboard
Mouse
Diskette Drive A
CD-ROM Drive
Additional 5.25”
Peripheral
Hard Disk Drive
Hard Disk Drive
Hard Disk Drive
Hard Disk Drive
Hard Disk Drive
Hard Disk Drive
Hard Disk Drive
continued