User's Guide
Table Of Contents
- About this Manual
- Manual Organization
- Intel® Serverboard Compatibility
- Additional Information and Software
- Safety Information
- Warnings
- Chassis Description
- Setting Up the Chassis
- Tools and Supplies Needed
- Installation Safety Instructions
- Remove Primary Access Cover
- Remove Bezel Assembly
- Remove Air Ducts
- Remove Hot Swap Fans
- Route Power and Data Cables to the Fixed Drives
- Install 3.5-inch Floppy Drive
- Install DVD or CD-ROM Drive.
- Install Fixed Hard Drive(s)
- Install Hot Swap Drive(s)
- Install Hot Swap Fans
- Install Server Board
- Install Air Dam
- Connect Cables to Server Board
- Install Add-in Board(s)
- Install Air Ducts
- Install an Additional Hot Swap Power Supply Module
- Install Bezel Assembly (Pedestal Only)
- Install Primary Access Cover
- Maintaining Your Server
- Tools and Supplies Needed
- Safety: Before You Remove the Access Cover(s)
- Warnings and Cautions
- Replacing a Fixed Fan (For Base and BRP Chassis Only)
- Replacing a Hot Swap Fan
- Replacing the Front Panel Board
- Replacing a Fixed Power Supply
- Replacing a Hot Swap Power Supply
- Replacing a Power Distribution Board
- Upgrading from a Fixed Power Supply to a Hot Swap Power Supply
- Technical Reference
- Equipment Log and Worksheets
- Regulatory and Compliance Information
- Getting Help
- Warranty

Setting Up the Chassis
Intel® Server Chassis SC5300 User Guide 35
Install an Additional Hot Swap Power Supply Module
✏
NOTE
This step only applies to chassis with redundant power supply capability. Do not perform this step
if your chassis has a fixed power supply.
1. Loosen screw (letter “A”) and remove power supply filler pane (letter “B”).
TP00543
A
B
Figure 43. Removing Power Supply Filler Panel
2. Insert power supply module until it clicks into place. Secure with screw (letter “A”) if shipping
chassis to another location
TP00544
A
Figure 44. Installing Additional Hot Swap Power Supply Module