Service Guide

Intel
®
Server System SR2600UR/SR2625UR Service Guide 39
3 Hardware Installations and Upgrades
Before You Begin
Before working with your server product, pay close attention to the “Safety Information”
on page v at the beginning of this manual.
Note: Whenever you service the system, you must first power down the server and unplug all
peripheral devices and the AC power cord.
Tools and Supplies Needed
Phillips* (cross head) screwdrivers (#1 bit and #2 bit)
Needle nosed pliers
Anti-static wrist strap and conductive foam pad (recommended)
System References
All references to left, right, front, top, and bottom assume the reader is facing the front of
the server system as it would be positioned for normal operation.
Note: If the procedure for servicing a particular component is identical for both Intel
®
Server
System SR2600UR and Intel
®
Server System SR2625UR, only the Intel
®
Server System
SR2600UR is shown for illlustration purposes.